Installing Full Flight Simulators
Bringing into dedicated location
Road transport from harbour to facility
Unloading and unpacking with a crane
Moving to the centre of the motion floor, using a crane and hydraulic jacks on rails.
Bringing to height for aircraft jack support, using three forklift trucks.
Mounting the motion system and removing the aircraft jacks.
Mounting sub-systems and wiring
Connecting wiring to computer room
Installing collimated mylar mirror
Installing "skull-cap", fibreglass side panels
Connecting to building infrastructure
Electrical power to motion system and UPS
Simulator fire alarm system to building fire alarm
Compressed air for oxygen masks, from a medical type oil-less compressor.